2021 Construction Projects

Project Description Impact Level
Lagoon Decommissioning Reduce sewage odor by decommissioning the sewage lagoons C
15th Street NW Water Looping Improve water distribution capacity in this area of the City C
Ninth Street NE Water Looping Improve water distribution capacity in this area of the City C
The Wilds 20th Addition Developer requested infrastructure C
Westview 4th Addition Developer requested infrastructure C
Northside Regional Sanitary Sewer Collector Rehabilitation Severe deterioration of the manholes within the Northside Regional Sanitary Sewer Collection System requires rehabilitation to prevent failure of the system. Phase 2 will include addressing manholes in this project that were ineligible for repair. A
Ninth Avenue NE Infrastructure Improvements Developer requested infrastructure to support upcoming industrial site improvement C
North/South Bikeway Route Install a north/south bikeway route along Drain 45 from Seventh Avenue E. to 13th Avenue E. to improve connectivity B
North Sheyenne Street Urban Reconstruction Reconstruct Sheyenne Street between Seventh Avenue W. and Main Avenue W. to improve sanitary sewer, storm sewer, water and street systems and streetscaping A
Ninth Street NW Water Distribution Loop Improve water main system along Ninth Street NW corridor B
The Wilds 21st Addition Developer requested infrastructure C
Westview 3rd Addition (Phase 2) Developer requested infrastructure C
Concrete Pavement Repairs Improve pavement conditions on collector and arterial roadways A
Sidewalk Improvements Construct sidewalks along properties within developed areas C
Xcel Energy Natural Gas Project Project by Xcel Energy to increase natural gas system capacity in West Fargo and Fargo A

Impact Level Legend:

A: Project will cause major traffic disruptions and significant impacts to surrounding properties.

B: Project will cause minor traffic disruptions and minimal impacts to surrounding properties.

C: Project will rarely or never cause traffic or property disruptions.

  1. Section of intersection closed at 10 ½ Avenue W. and Eighth Street W. due to asphalt repairs

    Repairs are anticipated to be complete by the end of the day Wednesday, May 12. Read on...
  2. First Street lane shift between First and Second Avenues to begin May 11, for asphalt repairs

    Repairs are anticipated to be complete by the end of the day Wednesday, May 12, pending weather conditions. Read on...
  3. 12th Avenue E. closure for bike path construction project extended

    Road closure between Fourth Street E. and Sixth Street E. Read on...
View All